BUILDING
How to Apply for a Permit
Each construction project that requires a permit under any of the codes is processed by the Lacey Building Division. There may be a need for Land Use Approval (SPR, etc.), prior to permit issuance. Please see Planning & Zoning Requirements.
For Building Division processing, please complete the appropriate application and submit the number of construction plan sets as noted on the application. This needs to include a site plan, engineering calculations to accompany any required engineering documents, complete construction documents, and complete energy code compliance forms. On-line permit processing is not available.
We will review all complete applications for compliance with the appropriate code(s). We encourage pre-submittal meetings to discuss code issues prior to completion of any construction documents. This will ensure both code compliance and an expeditious and efficient review of the drawings for any project.
Once the plans are reviewed for code compliance and all other City requirements are met (see LMC 14.04.015 Prerequisites to Permit Issuance) and the fees have been paid, the permit will be issued.
Some permits can be issued "over-the-counter" upon receipt of the appropriate fee. Examples include permits for replacing a hot water heater, adding an electrical circuit, residential re-roofing or re-siding, and other simple projects. Projects requiring plan review cannot be issued over the counter. These projects range from residential decks to large commercial buildings. Timelines for the plan review process are:
|
Residential Addition/Alteration/Remodel: |
2 weeks |
|
New Single Family Residence: |
2 weeks until the first Plan Review Letter |
|
Commercial: |
3-4 weeks until the first Plan Review Letter |
Commercial applications require Plan Check Fees to be paid at the time of submittal.
Many plan checks can take less time; however, please allow for the above review periods in your project schedule.